Central Slotted Column for cohesive materials

Tailormade     Proven Expertise    No Block Ups     Cost-effective    Flexible Partnership

CENTRAL SLOTTED COLUMN FOR COHESIVE MATERIALS

In order to eliminate block-ups caused by the poor flow properties
of FGD Gypsum or crushed limestone, we designed a central slotted column for smooth reclaiming. The material is fed through the slots formed by the horizontal flat rings, and freely descends down the column. Our silos for sticky products are also equipped with a drainage system at the bottom to prevent a sticky layer in the lower regions of the silo. In addition, we have developed a system that creates under-pressure in the dewatering system. The complete system will improve logistic flexibility while it preserves the  condition of the stored material.

COST EFFICIENT ALL-IN-ONE SOLUTION

The Eurosilo storage solution for FGD Gypsum incorporates three   vital functions at the smallest possible footprint. Dewatering,   storage and load out are all located in one fully automated silo   system. Compared to shed storage this adds up to numerous   advantages. Instead of a separate dewatering, storage and load out   facility – needing operators, power shovels and transport – there is   only one cost effective solution. Not only will it reduce the required   space to a third, it will also minimize the required headcount and   improve operational reliability in handling FGD Gypsum or other   cohesive material. Compared to conventional silos with a bottom   discharge plow feeder system, our system increases the storage   period from a few days to more than three months without the risk   of block ups.

 

 Maximum logistic control & flexibility

 Minimal operating and maintenance costs

 High availability due to minimal downtime

 Minimal footprint for large scale storage

 Built in dewatering & load out underneath

 No block ups with FGD Gypsum or crushed limestone

 

 

Download

How to handle poor flow
characteristics of FDG Gypsum?

 

Download our general company brochure

Download our latest ebook about efficient fertilizer storage with the Eurosilo® system.

 

Have a look at our references in your industry.

 

 

 

Over 60 plant-sites use the FGD Gypsum Eurosilo

Storing FGD Gypsum requires innovative solutions that space saving, cost-efficient and utmost reliable in handling cohesive bulk material. The FGD Gypsum Eurosilo has become a renowned system to solve all storage issues, such as poor flow characteristics, limited space and logistic efficiency. We have engineered and built this system over 60 times at plant sites in Asia, Europe and the US.

We’re happy to provide more detailed information.

2021-04-22

Meet our new ESI team member, E&I Engineer Arno Dijkstra

Everyone in technology knows that talented and experienced professionals are really hard to come by. That’s why we’re proud to say that we’ve found a great match for our team of engineers. He’s already busy in onboarding at ESI since the first of this month, but...
2021-02-15

Time to step up in ’21

Despite the COVID-19 pandemic that hit the world in 2020, there was no slowdown at ESI. In fact we were even more busy handling multiple large projects. The Eurosilo system has truly become a new standard and ESI is consistently building its position as worldwide leader in enclosed, vertical storage. Within our existing portfolio we are well aware...
2021-01-12

South Point Engineering new agent for Latin America & Caribbean

Sometimes the quest for quality and innovative solutions offers a short cut in connecting businesses around the world. This is how we came across a great company, specialized in bulk material handling solutions at ports in Latin America, via a technology partner that we work with...
2020-12-03

Online Commissioning Shidongkou Project

The worldwide pandemic required us to adapt and find new ways to proceed our projects. By setting up remote collaboration, Project manager Jan-Erik Dijksman and Project Engineer Alexander van den Berg succeeded in the online commissioning of one of the two 100K coal silos at the Shidongkou Power Plant in Shanghai. “Instead of physically...
2020-11-23

From our agent in Turkey: Rising Eurosilos, Rising Image

As general manager at Archimediz Maritime Services, Consulting and Energy Technologies, Özlem Ünal points out the one essential element that makes a large project such as the Hunutlu Eurosilos work: the human factor. The stunning look of the rising silos at the huge building site, inspired Özlem to write a great article. We are happy...
2020-07-06

New ESI agent for Poland: RICCO International Trade & Consultancy

We’re happy to introduce RICCO International Trade & Consultancy as our new agent for Poland. As of June this year they take care of complete projects, same as they do for many tech companies from outside Poland. CEO and founder Krzysztof Kucharski says: “We were not looking for another supplier, but the markets and the technology...
2020-05-08

Extraordinary logistics for the EMBA Hunutlu Power Station

In 2019 ESI Eurosilo received the biggest order in its history with three 100,000 m3 coal silos for the EMBA Hunutlu thermal power station in Turkey. This requires production and project management at an unprecedented level. Getting all the mechanical equipment to the building site is a project in itself. “We’re already at a 100 containers - and counting”, says Project manager Patrick Spaas...
2020-01-07

First FGD Gypsum at RTU Ugljevik power plant

Last month, December 2019, the first FGD gypsum was produced by the new desulfurization plant, built by MHPS-E, at the RTU thermal power plant in Bosnia and Herzegovina. The commissioning of the desulfurization plant also initiated the commissioning...
2019-12-23

2019 was a true roller coaster year!

This year has been a true roller coaster for ESI, with more challenges than ever. We smashed the all-time high of last year, of which we thought was a one off event , and at the same time we were confronted with the essence of our company. That is to remain the exact…
2019-12-05

Final shipments to mega-construction site

Last month the inspections of the shipments to the construction site of the new thermal power plant in Seocheon South Korea, were successfully concluded. Our partner Daeyang Rollent, their customer HSHI and the end-user Komipo came to Europe several times to…

 