欧罗仓FGD石膏存储解决方案以最小的占地面积结合了三种工艺流程。脱水,储存和卸载全部结合在一个全自动筒仓系统。不需要单独的脱水装置和运输到储存和装载设施——需要操作员、动力铲车和运输——只有一种成本节约和完整的解决方案。它不仅可以减少工厂所需的空间到三分之一,还可以减少所需的人力,大大提高处理湿性和粘性的FGD石膏的可靠性。与传统筒仓相比,Eurosilo系统将储存期从几天延长到三个多月以上,没有任何堵塞的风险。

 

Benelux案例 荷兰Uniper电厂

Uniper Benelux拥有的坐落在荷兰Maasvlakte发电站是燃煤和生物质发电厂。为了满足最新的排放要求,该发电厂配备了烟气净化系统。ESI被寻求替换FGD石膏的初始存储系统,因为原系统持续造成流程问题,以及由于封堵时间的延长而产生的额外成本。自2016年改造以来,欧罗仓系统成功地处理了发电站的存储系统问题。

 

中心开槽柱用于粘性材料

为了消除因脱硫石膏流动性能差而造成的堵塞,筒仓配备了强大的回收系统:中央槽柱。储存的FGD石膏通过水平的平环形成的槽输送,并沿柱子自由下降。FGD石膏欧罗仓底部有一个排水系统。这就防止了在储存物料的较低区域形成粘性层。此外,我们还开发了一个系统应对脱水系统中产生压力不足。完整的系统将提高您的流程灵活性和存储石膏的保存条件。

 

流程可靠性和灵活性

  • 最大化的流程控制和灵活性
  • 无障碍应对FGD石膏
  • 最小化的操作和维护成本
  • 高性能,极少的卡顿时间
  • 占用面积最小且可大量储存
  • 集脱水、储存和装载于一体

 

 

News

2019-07-12

Shidongkou power station chooses enclosed coal storage

Recently we received the order for two 100.000 m3 coal silos to be built at the Shidongkou First Power Plant in Shanghai.
2019-07-01

Three 100.000 m3 coal silos for the EMBA Hunutlu Plant

With three large coal silos for the EMBA Hunutlu thermal power plant in Turkey, ESI recently received the biggest order in its history.
2018-07-24

Highlights Feasibility Study India

In order to offer NTPC Group in India de...
2017-06-19

The first petcoke has been loaded into the brand new Eurosilo in Oman

The commissioning of the twin silos system for Orpic, one of the fastest growing oil companies in Oman, is in full swing now. Two new large Eurosilos are now being loaded with petcoke. The first testing of the material handling will take place soon.
2016-11-28

Tight schedule pet coke silos Oman

Under harsh conditions of over 45 degrees Celsius, the Eurosilo equipment is being preassembled outside at one of the refineries of Orpic in Oman. As the production of pet coke is about to commit, our focus is to keep pace with the tight overall schedule.
2016-11-28

Short payback period silo storage India

In order to offer NTPC Group in India detailed insight in the feasibility of replacing open stockyard storage by enclosed silo storage, we recently completed and presented an extensive study. One the outcomes is a payback period of only a few years.
2015-12-17

Two years of experience with the 100,000 m3 coal storage silos

Now available for download a informative...
2015-08-11

打造品牌

浏览我们的新网站! 您会注意到, 随着我们成为筒仓存储解决方案领域的市场领跑者,...

Downloads


How to handle poor flow
characteristics of FDG Gypsum?

Have a look at our references
in your industry




订阅我们的通讯!

  • 这个字段是用于验证目的,应该保持不变。