The first petcoke has been loaded into the brand new Eurosilo in Oman

The first petcoke has been loaded into the brand new Eurosilo in Oman

Previously to the commissioning phase, as specific erection procedure for the two silo was designed in close cooperation with main contractor Larsons & Toubro. The roof structure was built at the silo floor and then hoisted from the inside, including the complete materials handling equipment, to the top of the silos. During the building phase our supervisor was stationed at the plant site to lead the building process.
The two Eurosilos will buffer between an input of pet coke at 80 tph and periodic output at 1,000 tph demand to provide more logistic flexibility to the plant.