Archives de
Author: wsp admin

News: Time to step up in ’21 (fr)

News: Time to step up in ’21 (fr)

Despite the COVID-19 pandemic that hit the world in 2020, there was no slowdown at ESI. In fact we were even more busy handling multiple large projects. The Eurosilo system has truly become a new standard and ESI is consistently…

Lire la suite Lire la suite

Online Commissioning Shidongkou Project

Online Commissioning Shidongkou Project

The worldwide pandemic required us to adapt and find new ways to proceed our projects. By setting up remote collaboration, we succeeded in the online commissioning of one of the two 100K coal silos at the Shidongkou Power Plant in Shanghai.

Lire la suite Lire la suite

2019 was a true roller coaster year!

2019 was a true roller coaster year!

This year has been a true roller coaster for ESI, with more challenges than ever. We smashed the all-time high of last year, of which we thought was a one off event, and at the same time we were confronted with the essence of our company.

Lire la suite Lire la suite

Inscrivez-vous à notre newsletter !

  • Ce champ n’est utilisé qu’à des fins de validation et devrait rester inchangé.