NEW MATERIAL HANDLING POWER

Retrofits

When technological issues, environmental regulations and cost reduction require a complete overhaul, we can provide a tailor made retrofit for your silo system. In fact, we install complete new mechanical equipment inside the existing silo at your plant site. We provide new material handling equipment inside your current storage facility.  

Proven track record

With an installed base of 150 Eurosilos around the world, starting from 1967, we have a track record of retrofits and midlife conversions in industries such as power production, agribulk and chemical process plants. You can count on accurate project management to ensure a tailor made approach at your operational plant site.

Accurate project management

For large engineering project such as a retrofit at your plant site, we provide complete and accurate project management. This end-to-end approach provides you with a single partner to control the complete process, from feasibility to commissioning to turnkey take over and service.

  • Feasibility study
  • Basic engineering
  • Detail engineering
  • Procurement
  • Manufacturing
  • Assembly
  • Commissioning
  • Turnkey take over
  • After sales service

Retrofits for Spaans, Weibull and AJO

Do you have a Spaans, Weibull or AJO silo that needs an overhaul in order to stay operational for years to come? ESI can support you with that. We handle Spaans silos since the acquisition of Spaans EBS and Spaans BHA in 2016 and we have performed successful retrofits on Weibull and AJO silos. Contact us for more details.

News

2021-02-15

Time to step up in ’21

Despite the COVID-19 pandemic that hit the world in 2020, there was no slowdown at ESI. In fact we were even more busy handling multiple large projects. The Eurosilo system has truly become a new standard and ESI is consistently...
2021-01-12

Online Commissioning Shidongkou Project

Sometimes the quest for quality and innovative solutions offers a short cut in connecting businesses around the world. This is how we came across a great company, specialized in bulk material handling solutions at ports in Latin America, via a technology partner that we work with...
2020-12-03

Online Commissioning Shidongkou Project

The worldwide pandemic required us to adapt and find new ways to proceed our projects. By setting up remote collaboration, Project manager Jan-Erik Dijksman and Project Engineer Alexander van den Berg succeeded in the online commissioning of one of the two 100K coal silos at the Shidongkou Power Plant in Shanghai. “Instead of physically...
2020-11-23

From our agent in Turkey: Rising Eurosilos, Rising Image

As general manager at Archimediz Maritime Services, Consulting and Energy Technologies, Özlem Ünal points out the one essential element that makes a large project such as the Hunutlu Eurosilos work: the human factor. The stunning look of the rising silos at the huge building site, inspired Özlem to write a great article. We are happy...
2020-07-06

New ESI agent for Poland: RICCO International Trade & Consultancy

We’re happy to introduce RICCO International Trade & Consultancy as our new agent for Poland. As of June this year they take care of complete projects, same as they do for many tech companies from outside Poland. CEO and founder Krzysztof Kucharski says: “We were not looking for another supplier, but the markets and the technology...
2020-05-08

Extraordinary logistics for the EMBA Hunutlu Power Station

In 2019 ESI Eurosilo received the biggest order in its history with three 100,000 m3 coal silos for the EMBA Hunutlu thermal power station in Turkey. This requires production and project management at an unprecedented level. Getting all the mechanical equipment to the building site is a project in itself. “We’re already at a 100 containers - and counting”, says Project manager Patrick Spaas...
2020-01-07

First FGD Gypsum at RTU Ugljevik power plant

Last month, December 2019, the first FGD gypsum was produced by the new desulfurization plant, built by MHPS-E, at the RTU thermal power plant in Bosnia and Herzegovina. The commissioning of the desulfurization plant also initiated the commissioning...
2019-12-23

2019 was a true roller coaster year!

This year has been a true roller coaster for ESI, with more challenges than ever. We smashed the all-time high of last year, of which we thought was a one off event , and at the same time we were confronted with the essence of our company. That is to remain the exact…
2019-12-05

Final shipments to mega-construction site

Last month the inspections of the shipments to the construction site of the new thermal power plant in Seocheon South Korea, were successfully concluded. Our partner Daeyang Rollent, their customer HSHI and the end-user Komipo came to Europe several times to…
2019-09-24

Doors Open Day at the KMC potato starch silo

Last month, on August the 21st, the building site of the new potato starch silo of KMC in Toftlund, Denmark, was open to the public. KMC organized a Doors Open Day to give local residents and interested parties a look inside the huge building that dominates the skyline. And as it turned out...

Inscrivez-vous à notre newsletter !