Trianel power plant Lünen Case Study

The Trianel coal fired power plant in Lünen is with 750MW output, the most efficient and cleanest coal fired power plant in Europe. The coal is unloaded by cranes at the plant and stored dust-free into the two Eurosilos that offer a total capacity of 200,000 tons, enough to operate the plant for about 30 days at full load. Dust emissions are virtually eliminated by using fully enclosed conveyor systems. Read more about the award winning environmental performance.

Case Study Lünen Coal-Fired Power Plant