BEST FIT FOR BEST PERFORMANCE

Wear and Spare Parts

Over time, technology changes drastically. This makes keeping track of specific parts and suppliers vital.
As a specialist in our industry we can provide a quick insight in availability of wear and spare parts.
Our Wear and Spare Parts Service is ready to cater to all your needs.

 

Best fit for best performance

Standard parts are sourced from the original equipment manufacturers, while construction parts are manufactured at our pre-selected workshops. We make sure that new spare parts are identical to – and interchangeable with – existing parts and we provide affordable substitutes for parts that have become unobtainable. All at an equal or higher quality level.

Lower TCO

Replacing worn out parts by new ones not only ensures proper operation, it also optimizes the total cost of ownership due to higher yield and longer lifetime. This means less service interruptions,  requiring service technicians to descend into the shutdown silo. For fast recovery of defects we can change a complete unit instead of mounting a specific part, due to improved technology. If available, we will present and discuss all options.

News

2019-07-12

Find what you ‘re looking for on our website

We are proud to announce the new content and structure of our website. Since the introduction of the design in 2015, we have seen great response from the market. An average of 2,800 users from all over the world visit...
2019-07-12

Shidonkou power station chooses enclosed coal storage

Recently we received the order for two 100.000 m3 coal silos to be built at the Shidonkou First Power Plant in Shanghai. With this order the China Huaneng Group initiates their shift from open and shed storage to environmentally friendly...
2019-07-01

Three 100.000 m3 coal silos for the EMBA Hunutlu Plant

With three large coal silos for the EMBA Hunutlu thermal power plant in Turkey, ESI recently received the biggest order in its history. As the new power plant is located in one of Turkey’s precious nature reserves, the plant needs...
2018-12-14

Meet our agent Brandon Na, Daeyang Rollent Co., Ltd.

ESI agent for Korea Dongwon (Brandon) Na is General Manager at Daeyang Rollent Co., Ltd. They are a leading manufacturer of conveyors and idlers for industrial companies, headquartered in Gyeonggi-do, in Korea. Brandon has a strong technical background in bulk...
2018-11-05

Meet our agent Janez Golob, Teknol

Our agent for SouthEast-Europe Sales Engineer Janez Golob is agent for ESI Eurosilo in the countries of SouthEast-Europe: Slovenia, Croatia, Bosnia & Hercegovina, Serbia, Montenegro, Kosovo and Macedonia. Together with Andrej Herlah he is running Teknol, a growing company  in...
2018-10-18

Eight coal silos for new thermal power plant in South Korea

ESI Eurosilo was recently rewarded a huge contract for the engineering and project management of eight Coal Silos at a new Thermal Power Plant in Shin SeoCheon, South Korea. To successfully engage in this project we partner withDaeyang Rollent Co....
2018-09-24

Potato Starch Silo AKV Langholt

In the last few weeks ago all the mechanical and pneumatic parts of the new potato starch silo for AKV Langholt were shipped to Denmark. In the meantime everything is mounted and we’re closely cooperating with the civil engineering company...
2018-09-24

FGD Gypsum Silo for MHPS

Last July we coped with serious challenges to meet up at MHPS in Kure, Japan. The severe flooding due to heavy rainfall, had damaged roads and railroads. Nonetheless, we managed to meet with the team of MHPS. We are now...
2018-09-20

All-time high at ESI

During the management buyout in 2017, we were already increasing our sales activities. But the results over the past one-and-a-half year have exceeded every expectation. Our efforts in continued customer care and approach have led to an unprecedented order intake....
2018-07-24

Highlights Feasibility Study India

In order to offer NTPC Group in India detailed insight in the feasibility of replacing open stockyard storage of coal by enclosed storage, we completed an extensive study that compares both systems. One of the outcomes is a payback period...

Sign up for our newsletter!