Retrofits

When technological issues, environmental regulations and cost reduction require a complete overhaul, we can provide a tailor made retrofit for your silo system. In fact, we install complete new mechanical equipment inside the existing silo at your plant site. We provide new material handling equipment inside your current storage facility.  

Best fit for best performance

With an installed base of 150 Eurosilos around the world, starting from 1967, we have a track record of retrofits and midlife conversions in industries such as power production, agribulk and chemical process plants. You can count on accurate project management to ensure a tailor made approach at your operational plant site.

Accurate project management

For large engineering projects such as a retrofit at your plant site, we provide complete and accurate project management. This end-to-end approach provides you with a single partner to control the complete process, from feasibility to commissioning to turnkey take over and service.

Spaans, Weibull or AJO?

Do you have a Spaans, Weibull or AJO silo that needs an overhaul in order to stay operational for years to come? ESI can support you with that. We have handled Spaans silos since the acquisition of Spaans EBS and Spaans BHA in 2016 and we have performed successful retrofits on Weibull and AJO silos. 

 

 

Contact us

Feel free to reach out to us with any questions, comments, or feedback.
Fill out our contact form, and we’ll get back to you as soon as possible.
Your inquiries are important to us, and we look forward to assisting you. 

Latest news

2019-07-12

Shidongkou power station chooses enclosed coal storage

Recently we received the order for two 100.000 m3 coal silos to be built at the Shidongkou First Power Plant in Shanghai.
2019-07-01

Three 100.000 m3 coal silos for the EMBA Hunutlu Plant

With three large coal silos for the EMBA Hunutlu thermal power plant in Turkey, ESI recently received the biggest order in its history.
2018-07-24

Highlights Feasibility Study India

In order to offer NTPC Group in India detailed insight in the feasibility of replacing open stockyard storage of coal by enclosed storage, we completed an extensive study that compares both systems. One of the outcomes is a payback period...
2017-06-19

The first petcoke has been loaded into the brand new Eurosilo in Oman

The commissioning of the twin silos system for Orpic, one of the fastest growing oil companies in Oman, is in full swing now. Two new large Eurosilos are now being loaded with petcoke. The first testing of the material handling will take place soon.
2016-11-28

Tight schedule pet coke silos Oman

Under harsh conditions of over 45 degrees Celsius, the Eurosilo equipment is being preassembled outside at one of the refineries of Orpic in Oman. As the production of pet coke is about to commit, our focus is to keep pace with the tight overall schedule.
2016-11-28

Short payback period silo storage India

In order to offer NTPC Group in India detailed insight in the feasibility of replacing open stockyard storage by enclosed silo storage, we recently completed and presented an extensive study. One the outcomes is a payback period of only a few years.
2015-11-06

Creando la Marca

¡Visite nuestra nueva página Web! Como se habrán dado cuenta, hemos modernizado y actualizado nuestra página Web ya que somos los actuales lideres en el mercado del almacenamiento en silos. Esto es parte de la actual campaña para alzar la...